diff --git a/docs/workflow-explorer/index.html b/docs/workflow-explorer/index.html new file mode 100644 index 00000000..1a2359da --- /dev/null +++ b/docs/workflow-explorer/index.html @@ -0,0 +1,668 @@ + + +
+ + ++ Create your first facility +
++ A facility is a physical site with its own tanks, work centers, + operators, and regulatory profile. A single-site shop has one + facility; a multi-site operator has several. +
++ Define process categories +
++ Categories group related finishing processes (plating, anodizing, + conversion coatings, etc.). Process packs reference these categories + when they load specific process types. +
++ No process types yet +
++ Install a process pack (EN, Chrome, Anodize, Black Oxide) to load + pre-configured process types, or create your own. +
+Understanding the organization and its context, interested parties, scope of the quality management system, and the QMS and its processes.
Top-management leadership and commitment, quality policy, and organizational roles, responsibilities and authorities.
Actions to address risks and opportunities, quality objectives, and planning of changes.
Resources, competence, awareness, communication, and documented information.
Operational planning and control of products and services, including design, external provision, production, release and nonconforming-output control.
Planning, implementation and control of the processes needed to meet the requirements for the provision of products and services.
Establish, implement, and maintain a process for managing operational risks to the achievement of applicable requirements that includes assignment of responsibilities, definition of risk criteria, identification and assessment of risks, mitigation actions, and acceptance of residual risk.
Establish a configuration-management process appropriate to the product with planning, identification, change control, status accounting and audits to ensure consistent product identification, traceability and control of physical and functional characteristics throughout the product life cycle.
Plan, implement and control the processes needed to assure product safety during the entire product life cycle, including hazard identification, risk assessment, management of identified risks, communication of risks to affected parties, and reporting and lessons learned.
Plan, implement and control processes, appropriate to the organization and the product, for the prevention of counterfeit or suspect-counterfeit part use and their inclusion in products delivered to the customer. Includes training, source controls, material and part verification, in-process control, quarantine, and reporting.
Customer communication, determination and review of requirements, and changes to requirements for products and services.
Review of requirements for products and services — ensuring the organization's ability to meet requirements before committing to supply. Handling of enquiries, contracts or order handling, customer feedback including complaints, and specific requirements for contingency actions.
Design and development planning, inputs, controls, outputs and changes.
Evaluation, selection, monitoring, and re-evaluation of external providers; type and extent of control; information for external providers.
Control of production and service provision, identification and traceability, property belonging to customers or external providers, preservation, post-delivery activities and control of changes.
Determine and meet requirements for post-delivery activities associated with products and services, including collection and analysis of in-service data, actions to be taken as a result of product problems, control and updating of technical documentation, approval and control of repairs, and controls required for off-site work.
Implement planned arrangements, at appropriate stages, to verify that product and service requirements have been met, including First Article Inspection requirements.
Ensure that nonconforming outputs are identified and controlled to prevent unintended use or delivery. Includes segregation, authority for disposition, and use of concessions.
Monitoring, measurement, analysis and evaluation; internal audit; management review.
Conduct internal audits at planned intervals to provide information on whether the QMS conforms to the organization's own requirements, the requirements of AS9100, and is effectively implemented and maintained.
Top management reviews the organization's QMS at planned intervals to ensure its continuing suitability, adequacy, effectiveness and alignment with the strategic direction of the organization.
General; nonconformity and corrective action; continual improvement.
React to nonconformities, evaluate the need for action to eliminate the causes, implement any action needed, review the effectiveness of any corrective action taken, update risks and opportunities, and make changes to the QMS if necessary.
Continually improve the suitability, adequacy, and effectiveness of the QMS, including considering outputs of analysis and evaluation, and management review.
Scheduled electroless nickel slash-sheet audit for Q3 cycle.
Chrome plating audit currently underway. Day 2 of on-site review.
Base checklist audit completed with full accreditation. Two merit observations noted for SPC controls and operator training programme.
Single-point failure risk on Line 2 EN tank — temperature controller is end-of-life with no redundancy.
Only one approved vendor for nickel sulphamate concentrate. Lead time has increased to 12 weeks.
Qualify secondary supplier (Atotech). Target completion by Q4.
XRF gauge R&R study showed marginal repeatability on thin deposits (< 5 µm).
Calibrated with new certified reference standards. Operator training refresher completed. Re-running R&R study next week.
Largest aerospace customer contract expires in 6 months. RFQ response due next quarter.
Account review meetings scheduled monthly. Preparing competitive pricing and capacity expansion proposal.
Rev C — Updated rinse-water conductivity limits per customer spec.
+ Rev B — Added mid-coat thickness checkpoint.
+ Rev A — Initial baseline release.
Covers AMS 2404 and MIL-C-26074 requirements for medium-phosphorus EN deposits.
Rev B — Revised current-density parameters for thin hard chrome.
+ Rev A — Initial baseline release.
Covers QQ-C-320 and AMS 2460 requirements for hard chrome deposits on aerospace components.
Supplier certificate references an outdated spec revision. Material quarantined pending metallurgical lab verification. GIDEP report to be filed if counterfeit is confirmed.
+ Link MRP work orders processed in this batch for full traceability. +
++ No quality holds on this work order. +
++ This NCR is mirrored into the Odoo Enterprise + Quality module so EE users can monitor it + from the native quality dashboards. +
++ The sync is one-way: Fusion Plating is the + source of truth. Edits made directly to the mirrored + quality.alert record will be overwritten the next + time this NCR changes. +
++ Turn off Auto-sync to Quality on an individual + NCR to freeze its mirror, or use the + Sync to Quality header button to push changes + on demand. +
+Annual compliance review completed by PSPC inspector. No findings.
Hard chrome plating on main landing gear strut per DND spec. Parts received under controlled goods receipt CGR-2026-041.
EN plated mounting brackets awaiting final inspection and shipment. Stored under controlled conditions per Security Plan.
Maintenance contractor entered Controlled Area B without signing the visitor log or obtaining AI authorization. Contractor was performing scheduled HVAC filter replacement and was unaware of the controlled-area boundary. No controlled goods were accessed or moved.
Contractor escorted out of controlled area immediately. Badge access log reviewed to confirm no other unauthorized entries. Controlled goods inventory verified — no discrepancies.