Commit Graph

2 Commits

Author SHA1 Message Date
gsinghpal
b98ee8a6fb docs(plating): implementation plan for technician receiving + shipping tablet
Bite-sized TDD plan across receiving ACL+sudo, delivery ACL, fp.job
ship-readiness helpers, shipping endpoints, and the workspace shipping
panel. Also patches the spec to record the sale.order status-write sudo
fix found during planning.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-29 00:50:23 -04:00
gsinghpal
df0de97a68 docs(plating): spec — technician receiving + shipping from the workstation tablet
Design for letting Technicians receive a confirmed order and ship a finished
order from the fp_job_workspace tablet surface. Receiving is ACL-only (the
panel + endpoints already exist); shipping adds a workspace panel + two
sudo-backed endpoints (generate label, mark shipped) gated on all order jobs
being awaiting_ship.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-29 00:35:40 -04:00