The Phase B plan (commit 8eb2c2de) listed 12 modules to sweep, but the
codebase has 13 more modules with ACL CSVs referencing the old role
group xmlids. Backward-compat (Phase A's implied_ids chains) keeps
these working today, but the old groups will be deleted after the
30-day rollback window — so the sweep must cover ALL modules with
plating-group ACL refs to avoid post-rollback breakage.
Sweeps: batch, bridge_documents, bridge_maintenance, bridge_mrp
(uninstalled but file present), bridge_quality (planned removal),
bridge_sign, compliance, culture (retired), kpi, logistics,
notifications, portal, reports.
Pattern matches the original sweep:
group_fusion_plating_operator → group_fp_technician
group_fusion_plating_supervisor → group_fp_shop_manager_v2
group_fusion_plating_manager → group_fp_manager
group_fusion_plating_admin → group_fp_owner
group_fp_accounting → group_fp_manager
group_fp_receiving → group_fp_shop_manager_v2
group_fp_estimator → group_fp_sales_rep
group_fp_shop_manager (legacy) → group_fp_manager
cgp_officer → group_fp_quality_manager
cgp_designated_official → group_fp_owner
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
57 lines
1.9 KiB
Python
57 lines
1.9 KiB
Python
# -*- coding: utf-8 -*-
|
|
# Copyright 2026 Nexa Systems Inc.
|
|
# License OPL-1 (Odoo Proprietary License v1.0)
|
|
|
|
{
|
|
'name': 'Fusion Plating — Maintenance Bridge',
|
|
'version': '19.0.1.2.1',
|
|
'category': 'Manufacturing/Plating',
|
|
'summary': 'Bridge standard Odoo Maintenance with Fusion Plating equipment, '
|
|
'plans, checklists, and sensor integration.',
|
|
'description': """
|
|
Fusion Plating — Maintenance Bridge
|
|
====================================
|
|
|
|
Extends Odoo's standard Maintenance module for electroless nickel plating
|
|
and metal finishing operations. Replaces Steelhead Software CMMS.
|
|
|
|
* Maintenance plans (templates linked to equipment categories)
|
|
* Checklist nodes (individual items within a plan)
|
|
* Labour cost tracking on maintenance events
|
|
* "From last maintenance" recurrence mode
|
|
* Equipment linked to Fusion Plating tanks and facilities
|
|
* Optional sensor measurement bridge (soft dependency)
|
|
|
|
Part of the Fusion Plating product family by Nexa Systems Inc.
|
|
|
|
Copyright (c) 2026 Nexa Systems Inc. All rights reserved.
|
|
""",
|
|
'author': 'Nexa Systems Inc.',
|
|
'website': 'https://www.nexasystems.ca',
|
|
'maintainer': 'Nexa Systems Inc.',
|
|
'support': 'support@nexasystems.ca',
|
|
'license': 'OPL-1',
|
|
'price': 0.00,
|
|
'currency': 'CAD',
|
|
'depends': [
|
|
'fusion_plating',
|
|
'maintenance',
|
|
],
|
|
'data': [
|
|
'security/fp_maintenance_security.xml',
|
|
'security/ir.model.access.csv',
|
|
'data/fp_maintenance_stage_data.xml',
|
|
'data/fp_maintenance_sequence_data.xml',
|
|
'data/fp_equipment_category_data.xml',
|
|
'views/fp_maintenance_plan_views.xml',
|
|
'views/fp_maintenance_node_views.xml',
|
|
'views/maintenance_request_views.xml',
|
|
'views/maintenance_equipment_views.xml',
|
|
'views/fp_maintenance_dashboard_views.xml',
|
|
'views/fp_maintenance_menu.xml',
|
|
],
|
|
'installable': True,
|
|
'application': False,
|
|
'auto_install': False,
|
|
}
|