Phase 2 was previously outlined as 'rename bridge_mrp → jobs'. That's destructive on entech. Revised strategy: build fusion_plating_jobs IN PARALLEL with bridge_mrp. A settings flag (x_fc_use_native_jobs) controls which path SO confirm takes. Default False = legacy MO flow stays. Cutover (Phase 9) flips the flag. Phase 2 breakdown into 11 tasks (2.1–2.11), totaling ~5 days engineering. All preserve bridge_mrp untouched until cutover. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>